|
嘉兴毗邻上海,紧依苏南,是浙江省接轨上海的前沿阵地。泸杭高速公路,乍嘉苏高速公路,正在建设的杭州湾大桥,规划中的泸杭第二高速公路,绍嘉高速公路及泸杭城际轨道交通等,市嘉兴成为浙江的重要交通枢纽,沟通苏浙泸,融入长江三角洲。离市区40公里的嘉兴港为国家一类对外开放口岸,全年货物吞吐量为1130.35万吨。嘉兴至上海虹桥机场,浦东国际机场、萧山国际机场都只有1个多小时的车程,全市境内的高级和次高级路面铺装率居浙江省之冠。
Regional preferences infrastructure
Jiaxing is adjacent to shanghai and south part of Jiangu. Thus it is the frontier of catching up shanghai strategy. The shanghai-Hangzhou Expressway, Zhapu-Jiaxing Expressway, and the projects under construction namely, Hangzhou Bay Bridge, the second shanghai –Hangzhou Expressway under planning, shaoxing-Jiaxing Expressway and shanghai-Hangzhou railway transportation system will make Jiaxing an important transportation hinge of north Zhejiang. Our strategy is to connect with Jiangsu, Zhejiang and shanghai, join the Yangtze River Delta region. Jiaxing harbor is 40 kilometers away from the down town area and it is the 1st grade harbor open to the outside world with the yearly holding capacity of 11,303,500 tons. There is only one hour drive from Jiaxing to Hongqiao airport in shanghai. Pudong international airport, Xiaoshan international airport. The top and second level ranking road surface rate are ranking the 1st in the province.

高速公路 Expressway

嘉兴区位图 The geographical map of Jiaxing
嘉兴是华东地区重要的能源基地。秦山核电一期,嘉兴电厂一期已建成投产。秦山和点二期、三期一部分建成投产,嘉兴电厂二期正在加紧建设,全部建成后总装机容量超过600万千瓦。嘉兴供电安全可靠,以行程220千伏和110伏为主网,35千伏和10千伏为配网的输配电结构。供水充裕,日供水能力160万吨,可满足生活、生产用水。供气现有石油液化气管道供应,2005年将提供管道天然气。污水处理工程已建成并投入使用,具有0万吨/日的设计规模,并预留管线通道,远期可达55万吨/日。嘉兴邮电通讯达到同类城市的先进水平,可于180多个国家和地区直接通话,10兆到户的宽带光缆网覆盖全市。可提供国际、国内直拨电话、传真、移动电话、电报、租用线路、电报设备、因特网、电在商务等服务。
Jiaxing is an important energy resource base of east China. The 1st term project of Qinshan nucleus power plant and the 1st term of Jiaxing power plant have been put into use. Parts of the 2nd and 3rd term of Qinshan nucleus power plant have been completed; the second term of Jiaxing power plant is under construction. The total installation capacity after construction will be 6 million kilo watt. The power of Jiaxing is reliable which has formulated a main grid of 220 and 110-kilo volt, subsidiary power transfer grid structure of 35 and 10 kilovolt. The city has abundant water supply by providing 1.6 million tons a day for living and production. The gas is provided by petroleum gas pipeline and by the year 2005, it can provide natural gas. The sewage process engineering has been completed and put into use, which has the designed holding capacity of 300000 tons per day, and the reserved pipe will allow it to reach the capacity of 550000 tons per day in the long run. The communication and post service of Jiaxing is an advanced situation compared with the cities of same ranking which can provide with the telephone service to more than 180 countris and regions. The 10M broad band Internet service can reach every part of the city. In addition, the international and domestic telephone call, fax, mobile phone, telex, hire wire, telex machine, internet,E-business are available here.

从上到下依次为: 污水处理工程 Sewage process engineering 秦山核电站 Qinshan nucleus power plant 嘉兴电厂 Power plant of Jiaxing
|
|